Sunday 22 April 2012

Bridge across Kankara Khadi near Daudnagar


Bamroli to Udhna-Navsari Highway

1
Location
Road from Bamroli to Udhna-Navsari Highway.
2
River/Nala/Creek
Kankara khadi
3
Lane
Four lane
4
Year of construction
1995-1996
5
Cost
Rs.182.65 Lacs 
6
Name of Contractor
M/s. Sona Builders, Surat.
7
Name of Consultant
Multi Media Consulting Engineers, Ahmedabad.


Saturday 21 April 2012

Dumas Beach (Gulf of Khambhat)


Entry gate at Dumas Beach



 Sun-down at Dumas Beach



Dumas Beach


Dumas Beach

 

Dumas Beach

 

 Dumas Resorts at dumas road



Dumas Beach

Distance from "Surat railway station, gujarat, india" to "Dumas Beach, Surat, Gujarat, India" is 22 kms (14 miles.)

Thursday 19 April 2012

Flyover bridge near Athwa Gate


overbridge near athwa gate

1
Location
Road from Sardar Bridge to R.T.O.
2
River/Nala/Creek
Fly Over Bridge
3
Lane
Two lane
4
Year of construction
1997
5
Cost
Rs.704.73 Lacs 
6
Details of BridgeL:

(i)Length of Bridge
692.12 (single lane) + 156.8 mtr. (double lane)

(ii) Number of span
19+5+2+17+6+2+14

(iii) Span Length
Dumas side - 17x11.2 +6x22.4+2x10.63
City side - 19x11.2+x22.4+12.02+9.22
9
Name of Contractor
Vijay M. Mistry Construction Pvt. Ltd., Ahmedabad.
10
Name of Consultant
Multi Media Consulting Engineers, Ahmedabad.

Monday 16 April 2012

No.146 near Sumul Dairy



Over bridge at Sumul dairy road

1
Location
Road from Sumul Dairy to Ashwanikumar
2
River/Nala/Creek
Approaches to Over Bridge on Railways (B.G.)
3
Lane
Two lane
4
Year of construction
1995-1997
5
Cost
Rs.301.88 Lacs
6
Details of Bridge

7
(i)Length of Bridge
approaches
850 mtr. Partly open span structures and partly closed retaining wall approach structures.

(ii) Number of span
37 Nos.

(iii) Span Length
14 mtr. c/c

(iv) Length of Returns
Left side - 165 mtr. Right side - 165 mtr
8
Name of Contractor
M/s. Ranjit Construction Co., Mehsana
9
Name of Consultant
Multi Media Consulting Engineers, Ahmedabad.