Monday 16 April 2012

No.146 near Sumul Dairy



Over bridge at Sumul dairy road

1
Location
Road from Sumul Dairy to Ashwanikumar
2
River/Nala/Creek
Approaches to Over Bridge on Railways (B.G.)
3
Lane
Two lane
4
Year of construction
1995-1997
5
Cost
Rs.301.88 Lacs
6
Details of Bridge

7
(i)Length of Bridge
approaches
850 mtr. Partly open span structures and partly closed retaining wall approach structures.

(ii) Number of span
37 Nos.

(iii) Span Length
14 mtr. c/c

(iv) Length of Returns
Left side - 165 mtr. Right side - 165 mtr
8
Name of Contractor
M/s. Ranjit Construction Co., Mehsana
9
Name of Consultant
Multi Media Consulting Engineers, Ahmedabad.

No comments:

Post a Comment