Swami
Vivekanand Bridge
1
|
Location
|
Road from Makai pool on left bank to Adajan on right bank.
|
2
|
River/Nala/Creek
|
Tapi River
|
3
|
Lane
|
Four
|
4
|
Year of construction
|
1990/1996
|
5
|
Cost
|
Rs.1551.28 Lacs
|
6
|
Details of Bridge
|
|
(i) Length of Bridge between ends of decking
|
625.00 mtr.
|
|
(ii) Number of span
|
25 Nos.
|
|
(iii) Span Length
|
25 mtr.
|
|
(iv) Carriage Way
|
2x7.5 mtr. + 1.5 mtr. Wide footpath on one side each on two separate
bridges.
|
|
(v) Length of Returns
|
Right side -34.40 mtr.
|
|
(vi) General Items
|
R.C.C. type railings.
|
No comments:
Post a Comment