Amroli bridge
1
|
Location
|
On U/s side of existing Tapi bridge of Amroli
|
2
|
River/ Nala / Creek
|
Tapi river
|
3
|
Lane
|
Two
|
4
|
. Year of Construction
|
July – 2010
|
5
|
Tender Cost
|
Rs. 2405.32 Lacs
|
6
|
Details of Bridge
|
|
|
(i) Length of Bridge(Between ends of Decking)
|
655.20 mt.
|
|
(ii) Carriage Way
|
7.5 mt. with 2.0 mt wide footpath on one side
|
|
(iii) Length of R.C.C. Approaches &Returns
|
(i) Katargam side - 91.59 mt.
(ii) Amroli side - 138.20 mt. |
7
|
Structural Details
|
|
|
(i) Foundation
|
1500 mm dia pile foundation
|
|
(ii) Substructure
|
R.C.C. Wall type solid piers
|
8
|
Name of Proof Consultant
|
Sardar Vallabhbhai National Institute of Technology, Surat.
|
No comments:
Post a Comment