Thursday 29 March 2012

Bridge across river Tapti near Makaipool


Swami Vivekanand Bridge

1
Location
Road from Makai pool on left bank to Adajan on right bank.
2
River/Nala/Creek
Tapi River
3
Lane
Four
4
Year of construction
1990/1996
5
Cost
Rs.1551.28 Lacs
6
Details of Bridge

(i) Length of Bridge between ends of decking
625.00 mtr.

(ii) Number of span
25 Nos. 

(iii) Span Length
25 mtr.

(iv) Carriage Way
2x7.5 mtr. + 1.5 mtr. Wide footpath on one side each on two separate bridges.

(v) Length of Returns
Right side -34.40 mtr.

(vi) General Items
R.C.C. type railings.

No comments:

Post a Comment