Swami
Vivekanand Bridge
1 
 | 
  
Location 
 | 
  
Road from Makai pool on left bank to Adajan on right bank. 
 | 
 
2 
 | 
  
River/Nala/Creek 
 | 
  
Tapi River 
 | 
 
3 
 | 
  
Lane 
 | 
  
Four 
 | 
 
4 
 | 
  
Year of construction 
 | 
  
1990/1996 
 | 
 
5 
 | 
  
Cost 
 | 
  
Rs.1551.28 Lacs 
 | 
 
6 
 | 
  
Details of Bridge 
 | 
 |
(i) Length of Bridge between ends of decking 
 | 
  
625.00 mtr. 
 | 
 |
(ii) Number of span 
 | 
  
25 Nos.  
 | 
 |
(iii) Span Length 
 | 
  
25 mtr. 
 | 
 |
(iv) Carriage Way 
 | 
  
2x7.5 mtr. + 1.5 mtr. Wide footpath on one side each on two separate
  bridges. 
 | 
 |
(v) Length of Returns 
 | 
  
Right side -34.40 mtr. 
 | 
 |
(vi) General Items 
 | 
  
R.C.C. type railings. 
 | 
 |

No comments:
Post a Comment