Sardar Patel
1 
 | 
  
Location 
 | 
  
Road from Ring Road to Adajan 
 | 
 
2 
 | 
  
River/Nala/Creek 
 | 
  
Tapi River 
 | 
 
3 
 | 
  
Lane 
 | 
  
Four 
 | 
 
4 
 | 
  
Year of construction 
 | 
  
1985/1991 
 | 
 
5 
 | 
  
Cost 
 | 
  
Rs. 1365.40 Lacs 
 | 
 
6 
 | 
  
Details of Bridge 
 | 
 |
(i) Length of Bridge between ends of decking 
 | 
  
700.00 mtr. 
 | 
 |
| (ii) Number of span | 
14 Nos.  
 | 
 |
(iii) Span Length 
 | 
  
50.00 mtr. 
 | 
 |
(iv) Carriage Way 
 | 
  
2 x 7.5 mtr.+ 3.15 mtr. wide footpath on both side. 
 | 
 |
(v) Length of Returns 
 | 
  
Left side - 217 mtr. 
Right side - 232 mtr. 
 | 
 |
7 
 | 
  
(i) Design Discharge 
 | 
  
34000 Cumecs 
 | 
 
(ii) Design H.F.L. 
 | 
  
R.L. 11.40 mtr. 
 | 
 |
(iii) Type of bridge 
 | 
  
High level bridge 
 | 
 |
(iv) F.R.L. 
 | 
  
R.L. (-) 43.06 mtr. (pier) 
R.L. (-) 28.00 mtr. (pier) 
 | 
 |
8 
 | 
  
Structural Details : 
 | 
 |
(i) Foundation 
 | 
  
Single circular c.c. well foundation with nominal reinforcement 7.5mt
  dia., 45.46 mt. deep below well cap. 
 | 
 |
(ii) Substructure 
 | 
  R.C.C. per with R.C.C. pier cap | |
(iii) Superstructure 
 | 
  Pre-stressed concrete 6 girder system simply supported over bearings and R.C.C. slab | |
(iv) General Items 
 | 
  R.C.C. precast railing | |
9 
 | 
  Name of Contractor | Gujarat State Construction Corporation Ltd. | 
10 
 | 
  Name of Consultant | Stup Consultant, Mumbai. | 